Thursday, June 30, 2016

Been a long time/All together now!

Time has a way of getting away from you.  I didn't realize that I had not put a blog post together for almost 5 months. A lot has happened during that time and this will be a long post.

After getting Lucy boxed in, I spent some time finishing all the roof supports and insulating her roof.  I used 1" silver faced polystyrene foam insulation.  This ended up causing a little problem later since I only had 3/4" recesses to put it in.  To keep water off of her roof, I created a domed roof.  I don't have any pictures of this, but what I did was take 3/4" plywood strips and created a 1-1/2" tall arc that went from side to side on the roof supports.  The center of the dome is at the roof vent.  I ended up adding these extra dome strips to 4 of my roof supports.  I tried to make the outer two a little shorter to let the aluminum flatten out evenly.

I stained and poly'd the ceiling, but first I had to sand it.  I used a flexible plywood for easy installation, but this material had a horrible surface finish.  I sanded it for at least 8 hours and there are still some machine marks.  Staining over your head is difficult and tiring, thankfully she is only 10' long.  It took 2 coats of stain and 2 of poly before I was happy with it.  Pro Tip: make sure to sand between coats of poly.  I didn't because I was tired of sanding and I have a slightly rough finish when it could have been smooth.

Next up was paint.  Since I was building Lucy in my garage, I didn't have a lot of extra room.  Luckily I have a small workroom in my basement.  I bought a lot of plastic sheeting and created a paint booth.  I hung a box fan at the one window in the room and used a respirator as I painted.


I started out trying to strip the paint off of the aluminum but I found that it really didn't want to come off. Instead of stripping, I ended up using a wire brush to scrape the paint off.  It worked well on most of the panels. Where holes appeared, I used JB Weld to fill the small holes.  I painted for weeks.  Bringing one panel into my basement paint shop at a time.  Each panel was cleaned, primed and painted.  It took about 3 days per panel.  I used spray paint for all of the aluminum and it came out pretty nice.  One thing I didn't account for was how little a can of paint actually covered. I went through probably 30+ cans of primer and paint in the end.


As I completed panels, I installed them on Lucy.  Here is her road side. This side has all of my services.  I added a new 30 amp input, cable input and water inlet.  The old water inlet was too low for my new 15 gallon tank.  The old inlet is still there to cover a hole in the skin.


Work continued on the interior.  I built the back gaucho bed and also the dinette seats.  Since the camper is small, I tried to create as much storage as possible.  Under the gaucho bed, I have 2 large drawers.  The dinette had a big drawer and also under seat storage. 


 For my kitchen drawers I wanted to do something special. I have a CNC milling machine so I cut out some Scotty shapes for a nice detail on the drawers.

As I got closer to completion, we finished little jobs like wiring up the outlets, painting the furniture and touching up some damage I did to the paint.  I also completed a really big job. Lucy's original roof was a 3 piece one that caused many of her water problems.  I decided to put on a one piece roof.  This was a big job, but not too difficult.  I bought the metal from an RV outlet online.  The shipping was almost as much as the metal.  I bent the channel on each end of the roof myself using some wood strips and a hammer.  The hardest part was cutting the metal to size.



Painting the roof was interesting.  I masked off the entire camper and hung plastic.  Painting took 2 weekends and was difficult because I have poor lighting in my garage. It did come out nice in the end.


After paint, I installed the windows and the edge trim.  I used butyl tape on everything and the installation went smooth.  I did miss a bit on one aluminum panel install.  When I put the front side window in, it did not cover all of the holes.  I ended up adding a few eyebrows to fix that issue. I painted and repaired the rock guard on the front window.  The last project was repairing the door.  I was able to repair the original Bargman lock.  The door was a mess when I took it apart.  Thankfully there was enough left that I could get some good measurements from it.





Tuesday, February 2, 2016

All under roof.

Made some real good progress the last few weeks.  I installed the last pieces of the ceiling and front. Most of the ceiling supports are in and I have cut out the fan hole.  I have also started insulating the top, but it is not done yet.


The upper kitchen cabinet has been painted and installed.  I also have gotten some of the electrical hooked up.  I am putting in a few 110V and 12V outlets. 

USB and Lighter outlet in black. 

 I love the ceiling lights we found and they look really nice when they are turned on. We decided on these lights after going to our local RV show last week.  They are nice and flat and they put off just the right amount of light. Plus the under cabinet lights work and look nice too.


At this point, I am trying to get the last of the ceiling supports and insulation in.  I have started running the power for all the exterior running lights. In the next few weeks, I will be prepping the ceiling for stain and building out the dinette seating. If all goes well, I will be prepping and painting the skins in March.

Cheers!